click for prev



click for next

back to top

Steve Van Meter

South West Pacific Railway, N

The railroad represents the Parts of the Southern Pacific Western Division and parts of the Western Pacific 1st Subdivision, from Oakland to Stockton in 1953.

The layout is built in a 600 sqft purpose basement. Construction is single level. Dispatching is by verbal authority

The layout is about 80% sceniced.

A typical session runs about 3.5 - 4 hours and uses 9 operators. Jobs include: Dispatcher, Yard Master, Road crews

NCE DCC with wireless throttles, all mainline engines have sound decoders, FRS Radios, Car Cards and Waybills. Uncoupling manual using pics.

Modified 12/04/2019